FMEA Risk Analysis

Requirements
REQ-xxx
V&V Plan
DV-xxx
Test Protocol
TP-xxx
FMEA Risk
FM / UR / PF ◀ here
Risk linkage: reference REQ-xxx, DV-xxx, or TP-xxx in controls and actions to connect risk controls back to requirements, V&V activities, and objective evidence.
Auto-saved locally
Risk bands: RPN < 60 Low RPN 60–159 Medium RPN ≥ 160 High Severity ≥ 9 = Critical (auto-escalate) AP per AIAG-VDA 2019 Table Bands per AIAG-3 §A.4 / SAE J1739; AP per AIAG-VDA Handbook (2019) §3.4 Table
No FMEA rows yet
Add a failure mode or load the example set to start prioritizing risk controls. The tool works fully offline — sign-in only adds cross-device sync.